1. Project overview
At an industrial wastewater treatment plant, process heat is currently produced by a natural gas boiler. Amanos designed a system that meets this demand with a 2.5 MW industrial heat pump using the plant's own waste heat. The heat pump connects directly to the existing process heating circuit and takes over the boiler's duty entirely.
| Project profile | |
|---|---|
| Facility type | Industrial wastewater treatment plant |
| Project status | Pre-feasibility (2026) |
| Existing heating | Natural gas boiler |
| Proposed system | 2.5 MW waste-heat-source industrial heat pump |
| Temperature regime / COP | 60/40°C / about 6 |
| Energy cost saving | About 48% |
| Carbon emission reduction | About 67% (about 3,311 t CO₂e per year) |
All values in this study are pre-feasibility calculations, not field measurements.
2. Objective and the current energy problem
Every day, 3,500 m³ of wastewater is heated from 24°C to 38°C before biological treatment. This means about 2,371 kW of process heat without interruption (about 56,900 kWh per day). Because heat is needed every day of the year, natural gas is one of the plant's largest and most constant energy costs.
At the same plant, the reactor outflow, blower discharge air and wastewater lines release their heat to the environment unused. The project aims to turn this lost heat into process heat, eliminate the need for natural gas, and cut both energy cost and carbon emissions.
3. Amanos's engineering solution
- From natural gas to a heat pump: All process heat is produced by a 2.5 MW industrial heat pump; the boiler is not needed even as backup.
- The plant's own waste heat: The heat pump lifts heat from the reactor outflow, blower discharge air and wastewater lines to 60°C.
- Direct process integration: The heat pump connects to the existing process heating circuit without a buffer tank; the existing counterflow heat exchanger is retained.
- Low temperature, high efficiency: The 60/40°C regime is matched to the process demand. The small gap between the waste heat sources and the heating temperature makes a COP of about 6 achievable.
4. Waste heat sources and system integration
The heat pump uses three waste heat sources together:
- Reactor outflow
- Blower discharge air
- Wastewater lines
According to the full-load design energy balance, a combined total of about 2,083 kW of waste heat is drawn from these three sources; about 417 kW of electricity is added to give 2,500 kW of useful heat. The 2,083 kW is a design value, not a source capacity confirmed by site measurement. With its low and relatively stable temperature, wastewater is a well-established renewable heat source for heat pumps [1, 2]. Source capacities will be confirmed with site measurements during detailed design.
The heat pump supplies 60°C water to the existing process heating circuit and reheats the water returning at 40°C. The process heating circuit heats the wastewater feed from 24°C to 38°C.
5. System diagram
Figure 1. Waste heat sources (combined about 2,083 kW per the design energy balance) → 2.5 MW industrial heat pump (about 417 kW electricity) → 60/40°C process heating circuit → process heat demand of the treatment plant. The system has no buffer tank and no boiler.
6. Technical performance
| Parameter | Value |
|---|---|
| Heat pump capacity | 2,500 kW |
| COP | About 6 |
| Temperature regime | 60°C supply / 40°C return |
| Electrical input (full load) | About 417 kW |
| Combined waste heat (full load, design value) | About 2,083 kW |
| Process flow | 3,500 m³/day |
| Feed temperature | 24°C → 38°C |
| Continuous process heat demand | About 2,371 kW |
| Integration | Direct to the existing process heating circuit, no buffer tank |
The design energy balance is simple: 417 kW electricity + 2,083 kW waste heat = 2,500 kW useful heat. The 2,500 kW capacity leaves a margin of about 129 kW (5.5%) above the 2,371 kW continuous demand to cover heat losses and operating fluctuations. The use of industrial heat pumps for process heat and their temperature limits are covered in detail in the literature [3, 4].
7. Economic benefit
Compared with the existing natural gas heating system, an energy consumption cost saving of about 48% is achieved.
This result is based on the pre-feasibility calculation and is not a field measurement. The figure compares the energy cost of the natural gas system with the electricity cost of the heat pump for the same process heat. It does not mean a 48% reduction in electricity consumption or in total energy use. The result depends on the plant's gas and electricity tariffs and should be updated as tariffs change. Investment, maintenance and financing costs are not included.
8. Environmental benefit
The comparison is made on the same useful heat: about 56,900 kWh of process heat per day.
| Natural gas boiler | Heat pump | |
|---|---|---|
| Daily energy input | About 66,941 kWh natural gas | About 9,483 kWh electricity |
| Daily emissions | About 13.52 t CO₂ | About 4.45 t CO₂e |
| Annual emissions | About 4,935 t CO₂ | About 1,624 t CO₂e |
Reduction: about 9.07 t per day and about 3,311 t CO₂e per year; reduction rate about 67%.
Assumptions:
- Process heat: 56,900 kWh/day; continuous operation 365 days a year (annual values are the rounded daily values multiplied by 365)
- Boiler efficiency: 85%
- Natural gas emission factor: 56.1 kg CO₂/GJ (IPCC 2006 default, net calorific value basis) [5]
- Electricity emission factor: 0.469 kg CO₂e/kWh (ETKB, Türkiye electricity consumption-point emission factor) [6]
- Heat pump COP: 6
Methodology note: This is a pre-feasibility estimate, not a measured value or a carbon inventory. The two emission factors have different scopes. The natural gas factor covers only CO₂ from combustion. The electricity factor reflects the average greenhouse gas emissions of grid generation as CO₂ equivalent at the point of consumption, including transmission and distribution losses. A definitive carbon footprint requires site-specific consumption data and a calculation under the relevant reporting standard.
9. Conclusion and project assessment
This project shows that wastewater treatment plants needing continuous low-temperature process heat can meet most of that demand from their own waste heat. The 2.5 MW industrial heat pump produces the plant's continuous process heat with about 417 kW of electricity and replaces the natural gas boiler. Compared with the existing natural gas heating system, an energy consumption cost saving of about 48% is achieved; based on the pre-feasibility calculation, carbon emissions fall by about 67%.
The project is at the pre-feasibility stage. The next step is to confirm the waste heat sources with site measurements and proceed to detailed design. Measured performance after commissioning will be published separately.
10. Frequently asked questions
Can a heat pump supply process heat at a wastewater treatment plant?
Yes. The treatment process needs a low temperature such as 38°C, which lets the heat pump run at high efficiency. In this study, a 2.5 MW heat pump was designed as the single heat source replacing the natural gas boiler.
Which waste heat sources does the heat pump use?
Reactor outflow, blower discharge air and wastewater lines. According to the design energy balance, a combined total of about 2,083 kW is drawn from these three sources at full load.
What does COP 6 mean?
The heat pump produces about 6 kWh of heat from 1 kWh of electricity; the other 5 kWh come from waste heat. 2,500 kW of heat requires about 417 kW of electricity.
What does the 48% saving refer to?
Compared with the existing natural gas heating system, an energy consumption cost saving of about 48% is achieved. The value is based on the pre-feasibility calculation. It does not mean a 48% reduction in electricity or total energy consumption.
How was the 67% carbon reduction calculated?
For the same useful heat, the combustion emissions of the natural gas boiler (IPCC 2006 factor) were compared with the emissions from the heat pump's electricity use (ETKB consumption-point factor). The result is a pre-feasibility estimate.
Why is there no buffer tank?
The process heat demand is continuous throughout the day. Because the heat pump is sized to meet this load directly, it connects to the existing process heating circuit without a buffer tank.
References
- Nagpal, H., Spriet, J., Murali, M. K., McNabola, A. (2021). Heat Recovery from Wastewater—A Review of Available Resource. Water, 13(9), 1274. doi:10.3390/w13091274
- Hepbasli, A., Biyik, E., Ekren, O., Gunerhan, H., Araz, M. (2014). A key review of wastewater source heat pump (WWSHP) systems. Energy Conversion and Management, 88, 700–722. doi:10.1016/j.enconman.2014.08.065
- Arpagaus, C., Bless, F., Uhlmann, M., Schiffmann, J., Bertsch, S. S. (2018). High temperature heat pumps: Market overview, state of the art, research status, refrigerants, and application potentials. Energy, 152, 985–1010. doi:10.1016/j.energy.2018.03.166
- Zühlsdorf, B., Amato, V., Poulsen, J. L., Andersen, M. P., Arpagaus, C., Schlosser, F., Dusek, S. (2024). IEA HPT Annex 58: High-Temperature Heat Pumps – Final Report (Report No. HPT-AN58-1). IEA Heat Pumping Technologies. heatpumpingtechnologies.org
- IPCC (2006). 2006 IPCC Guidelines for National Greenhouse Gas Inventories, Volume 2: Energy, Chapter 2: Stationary Combustion. ipcc-nggip.iges.or.jp
- Republic of Türkiye Ministry of Energy and Natural Resources (ETKB). Türkiye Electricity Generation and Consumption-Point Emission Factors. enerji.gov.tr
Next step
If your plant has a continuous process heat demand and unused waste heat, we prepare a similar pre-feasibility study using your operating data. Book a technical call.